
Unloading car, then dyno to get base numbers BEFORE motor swap (before and after specs)

Mr. X's N.A. High Output Build

Starting with a 1994 SR20DE

Getting taken apart


Head off of the block

Dirty, but good shape

Head is in good shape, just dirty






Valve job completed

Greddy valve springs installed

Crank is in pristine shape for a rebuild

Block is torn down and ready for boring

Main caps are in great shape

JGY sleeves installed

Bored with the JGY torque plate to 90mm

No chamfer on cylinder lips (another JGY specialty)

Block is prepped for engine room building

Nice looking DE power house

Crankshaft cleaned and prepped for block

Crank installed into block with Nissan bearings




Eagle rods and CP Pistons


Rods and pistons assembled

Assembled bottom end




|